The preparation of the compensation agreement will take up to four weeks. After the conclusion, copies of the prepared agreement will be sent for signature to your company address. The agreement prepared includes the amount of the surety, administration and engineering costs as well as the insurance coverage to be provided before the approval of the compensation contract. A compensation agreement authorizes a certified contractor working on behalf of a landowner to dig, break or rebuild a road for a given project. This agreement: It is illegal to dig up, break or reconstruct something on any part of a street in the City of Calgary without written permission from the Highway Manager. This authorization takes the form of a road exemption contract. The road to the right of the road includes: urban roads, sidewalks, entrance crossings, concrete roads, boulevards, curbs and gutters, back lanes/alleys and sidewalks. This form is a settlement contract with the City of Calgary that must be signed for productions of 10 days or less. This form must be downloaded and can be emailed to [email protected]. In your application to the City to prepare a compensation contract, you should specify: Please note that as soon as a compensation contract has been approved by the City, you must obtain an excavation permit before starting construction. For more information, visit the search authorization page. Requests for low-level flights for each type of aircraft within the City of Calgary require a letter from No Objection from The City. Once the letter is received, the applicant must make it available to Transport Canada.

An independent contractor has a permanent compensation contract with Roads. For each project, the compensated contractor asks for an endorsement to his main contract. A compensation contract can only be approved when all copies of the signed contract are returned to the city, as well as: Will you use urban parking, streets, parks or transit? Do you need emergency medical services, the City of Calgary Fire Department or on-site policing? Permission is required. It takes up to six weeks for the city to prepare and approve a road exemption contract, provided that the applicant provides all documents, proof of insurance, deposit and fees in a timely manner. As part of the compensation agreement, if you build a lane, replace the sidewalk and gutter, or do other work that could affect the calculation of the roadway, the City will conduct an investigation and provide construction notes. Ask for the preparation of an ePermits compensation agreement To request a refund or ask about road compensation contracts, please contact us via the eServices application below. Applications must be sent at least ten (10) days in advance for all services listed below at our movie office, TV and Creative Industries, unless otherwise stated.